Specializing in the installation and design of voice data, video and fiber optic cabling systems
HEALTH CARE PROJECTS
See some of our latest projects. Our dedication to quality is unsurpassed in the industry. We have been awarded the largest contracts in the state of Arizona. See why others have chosen CTS.
- Sagewood Retirement Community
- Herbert K. Abrams
Public Health Center
- Mayo Clinic Hospital
Vertical Expansion
- Maricopa Integrated
Health Services
Project Statistics:
Year: 2008
CTS Contract Value: $534,000.00
SF: 128,000 - Bonded: Yes |
Owner:
Sagewood Retirement Community
4555 East Mayo Blvd.
Phoenix, AZ 85050 |
Architect:
LSW Architects
2333 W. Northern Avenue, Ste 9
Phoenix, AZ 85021 |
General Contractor:
Weitz Construction
5555 E. Van Buren Street Suite 155 Phoenix, AZ 85008 |
CTS Personnel:
Estimator: Scott Tubbs
Project Manager: Drew Tucker
Site Foreman: David Leon |
Project Description:
Provided and installed a complete in ceiling cable support system including cable tray and 4,000 j-hooks.
Provided and installed cabling infrastructure in over 534 villa’s, condominiums, penthouses and townhomes. All Category 6 cable installation with over 6,000 plus cable drops.
CTS built out one main telecommunication room (MTC) and (11) telecommunication rooms (TC). Each telecommunication comprised of open frame relay racks, cabinets, grounding systems and cable tray.
Provided and installed a large fiber optic backbone system comprising of 12MM 50um and 12 SM optical fiber strands feeding from the MTC to each TC closet.
Provided and installed (1) 200pr PE 89 from the MTC room to each TC room.
Provided and installed a coaxial CATV system including a backbone .500 osp coax, TV locations and head end room build outs.
Project Statistics:
Year: 2006
CTS Contract Value:
$534,000.00
SF: 128,000 - Bonded: Yes |
Owner:
Pima County
130 W. Congress
Tucson, Arizona |
Architect:
Durrant Group
410 N. 44th Street, Ste 800
Phoenix, AZ 85008 |
General Contractor:
Lloyd Construction Company
2180 N. Wilmot Rd
Tucson, AZ 85712
|
CTS Personnel:
Estimator: Brian Rhynas, RCDD
Project Manager: Brian Rhynas
Site Foreman: Brian Sands |
Project Description:
CTS was awarded a contract with Pima County in 2006 to provide and install the tele/data cabling infrastructure for the new Public Health Center located in Tucson, Arizona.
2,868 cables to approximately 921 work area outlets thru-out the 4 story facility. Each outlet consisted of 2 data cables and 1 voice cable
CTS built out 8 new telecommunication closets (TC)
Fiber Optic Backbone System 48MM/6SM
Large Copper Backbone System
Project Statistics:
Year: 2008
CTS Contract Value: $534,000.00
SF: 128,000 - Bonded: Yes |
Owner:
Mayo Clinic
5777 East Mayo Boulevard
Phoenix, AZ 85054
|
Architect:
Mayo
In-house
Architects
|
General Contractor:
Kitchell Construction
1707 East Highland, Suite 100
Phoenix, AZ 85016
|
CTS Personnel:
Estimator: Scott Tubbs
Project Manager: Chad Blotkamp
Site Foreman: Brian Sands |
Project Description:
CTS was awarded the contract directly with Mayo Clinic to install all the new tele/data, access control, CCTV, CATV and nurse call cabling for the vertical expansion project at the Mayo Hospital in Phoenix, Arizona. CTS worked very closely with Kitchell Construction to ensure an on time and on budget installation.
New copper and fiber backbone to the 6th and 7th Floor
Installation of approx. 400 Category 6 cables
Installation of the all the Nurse Call Cabling
Installation of a new CCTV and CATV system
Installation and build out of (2) new IDF rooms
Project Statistics:
Year: 2007-2010
CTS Contract Value: $700,000
SF: 140,000 - Bonded: No |
Owner:
Maricopa Integrated Health Systems
2601 E. Roosevelt
Phoenix, AZ 85013
|
Architect:
None
|
General Contractor:
Hill Rom
1069 State Route 46 East
Batesville, IN 47006 USA
|
CTS Personnel:
Estimator: Scott Tubbs
Project Manager: Danny Lujan
Site Foreman: Danny Lujan |
Project Description:
Provided and installed a new cable infrastructure to support a new Nurse Call System in the existing Maricopa County Hospital. This includes all the cabling from the rooms back to the nearest IDF closet and all new cabling in the patient rooms, ICU units, ER etc
Test all the new cabling infrastructure installed by CTS
CTS is responsible for installing customer provided nurse call devices such as dome lights, code blue, nurse call locators, pull stations and audio devises
CTS is responsible for install the Hill Rom networking equipment and patching all the devises
CTS today continues to have full time techs supporting all the day to day maintenance needs for MIHS