"CTS develops and implements tailored communication networks that incorporate flexibility, reliability and longevity to meet unique client objectives."
Specializing in the installation and design of voice data, video and fiber optic cabling systems
GOVERNMENT PROJECTS
See some of our latest projects. Our dedication to quality is unsurpassed in the industry. We have been awarded the largest contracts in the state of Arizona. See why others have chosen CTS.
  • City of Phoenix - Phoenix Convention Center
  • City of Phoenix - Phoenix Crime Laboratory
  • Arizona National Guard
    Readiness Center
  • Santa Cruz County Detention Center

City of Phoenix
Phoenix Convention Center
Phoenix, Arizona

Project Statistics:

Year: 2006
CTS Contract Value: $1,535,000.00
SF: 750,000 - Bonded: No

Owner:

City of Phoenix
210 W. Washington, Basement
Phoenix, Arizona 85003

Architect:

HOK
9530 Jefferson Boulevard
Culver City, CA 90232

General Contractor:

Hunt Construction
426 North 44th Street, Suite 410
Phoenix, AZ 85008

CTS Personnel:

Estimator: Scott Tubbs
Project Manager: Chad Blotkamp
Site Foreman: Dave Martinez
SageWood.
View Photos

Project Description:

CTS was awarded the contract directly with the City of Phoenix to supply and install the structured cabling system for the new Phoenix Convention Center West Building and South Re-model projects.
  • 1,300 work area outlets. Consisting of (4) CAT6E,(4)MM 62.5 optical fibers and (4)SM optical fibers
  • 31 telecommunication closets (west and south buildings) – 6 Levels
  • Fiber Optic Backbone System – 48MM/24SM from the MTC to each TC room
  • Performed over 13,000 optical fiber termination in the horizontal and riser system
  • Large Copper Backbone System
  • Completed all voice and data cross connects
  • City of Phoenix
    Phoenix Crime Laboratory
    Phoenix, Arizona

    Project Statistics:

    Year: 2007
    CTS Contract Value: $330,000.00
    SF: 152,000 - Bonded: No

    Owner:

    City of Phoenix
    210 W. Washington, Basement
    Phoenix, AZ 85003

    Architect:

    McClaren, Wilson and Lawrie
    8705 N. Central Ave
    Phoenix, Arizona 85008

    General Contractor:

    Gilbane Construction
    2111 East Highland, Suite 350
    Phoenix, AZ 85016

    CTS Personnel:

    Estimator: Scott Tubbs
    Project Manager: Chad Blotkamp
    Site Foreman: Brian Sands
    Pheonix Crime Lab.
    View Photos

    Project Description:

    CTS was awarded the contract with the City of Phoenix ITD department to supply and install the structured cabling system for the new Phoenix Crime Lab. When the crime lab is completed (estimated mid 2007) it will be the most technology advanced crime lab in the country. CTS worked very closely with the Phoenix Police Technology staff and the Phoenix Information Technology Department to ensure that all the cabling requirements were met.
  • 1,100 work area locations consisting of (2) CAT6E
  • 7 telecommunication closets – 3 floors
  • Large Fiber Optic Backbone System – 48MM/24SM from the MTC to each TC room
  • Copper Backbone System – Consisted of 300pr (ARMM) CAT 3 to each telecommunication room
  • Arizona National Guard Readiness Center
    Buckeye, Arizona

    Project Statistics:

    Year: 2008 / 2009
    CTS Contract Value: $250,000.00
    SF: 110,000 - Bonded: No

    Owner:

    Arizona National Guard
    Phoenix, AZ

    Architect:

    Burns and McDonnell
    4742 N. 24th Street STE 355
    Phoenix, Arizona 85016

    General Contractor:

    Sundt Construction
    2620 S. 55th Street
    Tempe, Arizona 85282

    CTS Personnel:

    Estimator: Scott Tubbs
    Project Manager: Brian Vallejo
    Site Foreman: Danny Lujan
    Arizona National Guard Logo.
    View Photos

    Project Description:

  • Provided and installed a complete in ceiling cable support system
  • Provided and installed over (150) work area outlets in (6) buildings. Each outlet consisted of 2 data cables and 2 voice cables
  • CTS built out one main telecommunication closet (MTC) and (5) telecommunication closets (TC). Each telecommunication closet comprised of open frame relay racks, cabinets, grounding systems and cable tray
  • Provided and installed a large fiber optic backbone system comprised of 24MM 50um and 12 SM optical fiber strands feeding from the MTC to each TC closet
  • Provided and installed (1) 100pr PE 89 from the MTC room to each TC room
  • Provided and installed the fire alarm cabling infrastructure
  • Santa Cruz County
    Justice and Detention Center
    Nogales, Arizona

    Project Statistics:

    Year: 2009 / 2010
    CTS Contract Value: $3000,000.00
    SF: 125,000 - Bonded: Yes

    Owner:

    Santa Cruz County
    2150 North Congress Drive
    Nogales, Arizona 85621

    Architect:

    DLR Group
    6225 N. 24th Street, Ste 250
    Phoenix, Arizona 85016

    General Contractor:

    Core Construction
    3636 Greenway Rd
    Phoenix, AZ 85032

    CTS Personnel:

    Estimator: Scott Tubbs
    Project Manager: Drew Tucker
    Site Foreman: David Leon
    Santa Cruz Justice and Detention Center.
    View Photos

    Project Description:

    Product: Sumitomo Air Blown Fiber/Ortronics/Berk-Tek
    Corporate Technology Solutions has been contracted to install a new Information Transport System (ITS) for the new Santa Cruz Detention Center located in Nogales, Arizona.

    The system includes a new Sumitomo air blown fiber optic backbone, large copper backbone system and the installation of a new horizontal category 6 infrastructure.

    The fiber optic backbone consists of (07) cell tubes with various multi-mode and single mode fiber bundles being installed from the MTC room to (6) new TC rooms in the facility. A new 100pr copper backbone will be installed from the MTC room out to (6) new TC rooms to support various pots and 1FB lines. In addition, we will be installing over 700 plus new category 6 cable to over 250 locations.

    CTS is also responsible for the build of a large MTC room and 6 new TC rooms located in the facility.