EDUCATION PROJECTS
See some of our latest projects. Our dedication to quality is unsurpassed in the industry. We have been awarded the largest contracts in the state of Arizona. See why others have chosen CTS.
- Maricopa Community Colleges District Office
- Gilbert Public Schools
District Wide
- Gilbert Public Schools
C.V. High School
Project Statistics:
Year: 2005
CTS Contract Value: $285,000.00
SF: 125,000 - Bonded: No |
Owner:
Maricopa Community Colleges
2411 West 14th Street
Tempe, Arizona 85281 |
Architect:
None
|
General Contractor:
Corporate Technology Solutions
1971 E. 5th Street, Suite 111,
Tempe, Arizona 85281 |
CTS Personnel:
Estimator: Brian Rhynas, RCDD
Project Manager: Brian Rhynas, RCDD
Site Foreman: Chad Blotkamp |
Project Description:
CTS was awarded the contract to supply and install the structured cabling system for the Maricopa Community Colleges District office. The project objective was to update the cabling infrastructure from a CAT3/CAT5 cable infrastructure to a CAT 6 infrastructure to support the installation of a new VOIP system and increase the bandwidth required for new applications.
1,100 work area locations consisting of (2) CAT6.
6 telecommunication closets – 6 floors
Cable Demolition of the old cabling infrastructure
New in ceiling cable support system
Project Statistics:
Year: 2009 / 2010
CTS Contract Value: $963,000.00
SF: N/A - Bonded: No |
Owner:
Gilbert Public Schools
140 South Gilbert Road
Gilbert, Arizona 85296
|
Architect:
None
|
General Contractor:
Corporate Technology Solutions
1971 E. 5th Street Suite 111
Tempe, Arizona 85281
|
CTS Personnel:
Estimator: Scott Tubbs
Project Manager: Chad Blotkamp
Site Foreman: Armondo Zevallos |
Project Description:
Corporate Technology Solutions was contracted directly with Gilbert Public Schools in conjunction with Hewett Packard to deploy and install 2,500 wireless access points in 36 school facilities district wide.
We provided and installed (1) category 6 cable from each access point to the nearest telecommunication closet, terminated, tested and labeled. In addition, CTS installed the wireless access point and patched in at the telecommunication closet.
During the installation CTS was also tasked with re-testing and confirming all the fiber optic backbone system’s met 10gig requirements for the deployment.
We worked very closely with the GPS IT department throughout the installation to insure that all the access points were active and working properly to meet the schools on-going data needs for it students and facility staff members.
Project Statistics:
Year: 2009
CTS Contract Value: $420,000.00
SF: 250,000 - Bonded: No |
Owner:
Gilbert Public Schools
140 South Gilbert Road
Gilbert, Arizona 85296
|
Architect:
459 N. Gilbert Road
Suite C-200
Gilbert, AZ 85234
|
General Contractor:
Core Construction
3636 Greenway Road
Phoenix, Arizona 85231
|
CTS Personnel:
Estimator: Scott Tubbs
Project Manager: Chad Blotkamp
Site Foreman: Brian Sands |
Project Description:
Provided and installed a complete in ceiling cable support system
Provided and installed over (475) work area outlets in 6 buildings. Each outlet consisted of 2 data cables and 1 voice cable
CTS built out one main telecommunication closet (MTC) and (5) telecommunication closets (TC). Each telecommunication closet comprised of open frame relay racks, cabinets, grounding systems and cable tray
Provided and installed a large fiber optic backbone system comprised of 12MM 50um and 12 SM optical fiber strands feeding from the MTC to each TC closet
Provided and installed (1) 100pr PE 89 from the MTC room to each TC room
Provided and installed a coaxial CATV system including a .500 osp coax backbone, TV locations and head end room build outs